3 Material Verification Procedures That Reduce Project Risk

Effective material verification answers a simple but critical question: will this material perform as intended under applied load, operating pressure, environmental exposure, and installation constraints?

Industry guidance from organizations such as the American Water Works Association emphasizes that material selection and performance must be evaluated in context, with design intent, operating conditions, and fabrication details aligned before risk moves downstream.

Material Verification​ Procedures to Address Before Fabrication Begins

For engineers, contractors, and supply houses, certified Waterworks products provide peace of mind, as they verify that materials have been tested, fabricated, and finished according to nationally recognized standards. This translates to less rework, reduced inspection delays, and complete confidence in compliance, helping every project stay on track, on budget, and up to code.

Procedure 1: Confirm the Application Fit

The first step in material verification is confirming that the selected material fits the actual application. This includes reviewing operating pressure, temperature, environmental exposure, installation conditions, and applied load assumptions. Written specifications provide boundaries, but performance depends on how materials behave once they are installed and placed into service.

Civil engineering guidance from the American Society of Civil Engineers reinforces that external loads, soil conditions, and support design all influence infrastructure performance. A material can meet specification and still be poorly suited for the application if these factors are not evaluated together.

Procedure 2: Verify Structural and Load-Related Details

Once the application fit is confirmed, the material verification must assess how the material will withstand stress over time. This includes reviewing wall thickness, joint type, load path, and support conditions. Applied load does not act independently. It is influenced by soil interaction, connection points, supports, and system pressure.

Technical research from the Ductile Iron Pipe Research Association illustrates how different pipe materials respond to external loads and ground movement, highlighting why load behavior must be evaluated before fabrication begins to prevent issues that are more difficult and costly to address later.

Procedure 3: Verify Fabrication and Protection Details

Lastly, fabrication and protective details play a critical role in long-term performance. This procedure includes verifying fabrication tolerances, weld quality expectations, fit-up, coatings, linings, and support considerations. Coatings and linings, in particular, are sometimes treated as secondary decisions, yet they directly affect durability and service life.

Guidance from the Association for Materials Protection and Performance emphasizes that verifying these details before fabrication begins helps prevent premature deterioration and inspection challenges that are difficult to correct later.

Work With Freedom Waterworks to Skip the Verification Gaps

When material verification is not done properly, gaps tend to surface later during inspection, startup, or operation. At that point, rework increases, pressure shifts to the field, and confidence across contractors, engineers, owners, and supply houses erodes.

At Freedom Waterworks, material verification is integrated into each project with our comprehensive quality control process. The goal is not to add steps, but to help teams confirm that all waterworks products are prepared to perform as intended before fabrication begins.

Contact our material verification experts to reduce downstream risk before fabrication begins.